Mace appointed B & K Structures to provide an optimised hybrid structure for the build – comprising a glulam frame with cross laminated timber (CLT) floor, roof and stability walls, together with perimeter wall cassettes. The structure was designed to deliver permanent quality, adaptability and long term energy efficiency, to meet the sustainability objectives.